Garage/Greenhouse The Kitchen (3/10/07)
|
Week Thirty-Six |
||
Trim in the master bedroom... |
...and in the great room. |
They ran drain tile from all the downspouts to the sewer...but it sure tore up the driveway! |
|
...and the lawn... |
...on both sides! |
Connecting the furnace... |
|
Punching heat into the finished half of the basement. |
The bar at the end of the kitchen has been laid out... |
The bar wall from inside the kitchen... |
|
Cobalt blue in the guest bath upstairs. |
|||