Garage/Greenhouse The Kitchen (3/10/07)
|
Week Seventeen |
||
Things have slowed down a little bit as Mark and Julie are facing a number
of decisions--including the full wiring scheme for lighting, outlets, audio and data. Kitchen design is also moving forward, and Julie and Mark have also made a decision to stone the parts of the front of of the house that are currently siding (see final picture below) and the back of the house. |
|||
August 26: Vents, drains and water supply lines in the downstairs bath. |
The layout of the back wall of the kitchen--based on a later meeting with the kitchen designer, this will be changing a little to accommodate a little more counter space. |
August 28: The curb in the master shower. |
|
The guest shower is laid out. |
The old stack, stoned to match the house. |
The house from the front. The new roof is almost complete. The white sided pieces are going to be replaced with stone to match. |
|